
(Dubai) – The Roads and Transport Authority (RTA) embarked on the technical trial run of the Dubai Tram on a track extending 2.5 km from the Tram Depot at Al Safouh. H.E. Mattar Al Tayer, Chairman of the Board and Executive Director of the RTA, was delighted with this step which is considered a milestone in the construction of the Dubai Tram project, adding that the technical trial run would continue till the official operation of the tram service in the final quarter of this year. The test track would be expanded in the near future to cover the entire tramway.
During the experiment the tram moved at varying speeds and tests were conducted covering the safety systems, power propulsion of tram carriages, brake system, sudden braking during emergencies, ground electrical feed along the tram track, overhead power feed used in the Depot, and the tram’s doors operation.